520 NE Ravenna Blvd
西雅图,华盛顿州98115
关于Montlake
总部:206-252-3300
传真:206-252-3301
蒙特莱克学校简介
就读地区 考勤区地图
学校领导和董事会地区
蒙特莱克的社区合作伙伴 Community resources and programs at Montlake小学
学校持续改善计划(C-SIP)
蒙特莱克小学C-SIP
The 学校持续改善计划(C-SIP) is an action plan for each school that identifies the areas a school plans to focus on in the current and coming school year, 他们希望学生达到的成绩目标, and how the school plans to collaboratively meet these goals.
The plans are updated regularly to reflect the strategies being used at each school. This document also serves as the school-wide improvement plan for our Title I schools.
学校及楼宇报告
School Report
蒙特莱克小学报告
School Reports show a brief snapshot of a school’s academic growth, 学生气候, 问责制, 家庭和员工敬业度, 以及学校的整体表现. School reports are produced by the State Office of Superintendent of Public Instruction for each school and district in the state and updated periodically throughout the year as data becomes available.
关于国家评估, 期望参加但没有参加的学生, 比如缺席或选择退出, 被算作非精通. This may affect the school’s overall proficiency rating.
Questions 正规买足球的App报告? 联系研究与评估部门 research@hzdl.net
学校气候调查
蒙特莱克小学气候调查
学校气候调查s are used for school-level improvements, 所有员工都要接受气候调查, 学生和家庭. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.
建筑历史
蒙特莱克建筑历史和信息
Montlake小学 School is on the Seattle Historic Preservation Landmarks List. Visit the city website to look up information about the landmark status.
石棉危险紧急反应法(AHERA)
The AHERA Asbestos Plan is not currently available for the Montlake建筑 由于施工. The plan will be updated as soon as building construction and occupancy is complete. 谢谢您的耐心等待.
对已知石棉的监测 约翰·马歇尔大厦 is performed every six months by a designated person to assess the condition of the Asbestos Containing Building Materials (ACBM). Six-month assessment results are maintained by the district. 根据AHERA的要求, SPS must maintain an Asbestos Management Plan (AMP) and keep it on file at the 约翰·马歇尔大厦.
The AMP is available for review during school hours, Monday through Friday. For additional information or if you have questions about the previous AHERA plan for Montlake小学, 请联系:
Wendy Couture
环境健康和安全经理
wjcouture@hzdl.net
206-252-0528
纪律仪表板
作为西雅图卓越计划的一部分, 正规买足球的App战略计划, the district is committed to interrupting disproportionate practices in discipline. To support this work and to increase transparency and 问责制, the district has created and published public facing discipline dashboards for each school which became available on November 1, 2021.
Discipline dashboard data reflects the current school year and will be updated quarterly throughout the school year. For questions or concerns, please reach out to the school leader for a specific school.
Academic Year:当前学年.
访问/违约: Click here to switch to an accessible version of the dashboard.
按月行动: Count of disciplinary actions by month and exclusion type.
Actions: Count of disciplinary actions for an exclusion type.
Attribute: Student Attribute (gender, race/ethnicity, special education served, 504 plan)
Days:排除类型的排除天数.
排斥日:排除天数.
纪律率: Count of students with at least one disciplinary incident divided by count of all enrolled students.
E. Expulsions: Count of emergency expulsions for a student attribute.
Enrolled:在校生总数.
排外行动:排他行为的计数 for a student attribute.
排除天:学生属性的排除天数.
排除类型:短期停牌(SS), 长期停飞(LS), 紧急驱逐(EE), 在校休学(IS), 驱逐(特异), 及临时替代教育环境(IA).
排他的行动:排他行为的计数.
Expulsions:学生属性的开除次数.
FERPA合规: Family Educational Rights and Privacy Act Compliance. *
按星期划分的事件:按星期计算的纪律处分次数.
按级别划分的事故:按年级划分的纪律处分次数.
按小时划分的事故:按小时计算的纪律处分次数.
按排除类别划分的事故:违纪事件数 for an exclusion type.
事件的学生属性或支持服务:违纪事件数. Incidents are counted as many times as there are students involved.
每100名学生的事件数:违纪事件数 divided by enrolled students and then multiplied by 100. Incidents are counted as many times as there are students involved.
Rate:排除类型的惩戒率.
School Name: School name.
Students: Count of students with at least one disciplinary incident.
Suspensions:学生属性的停学次数.
Weapons:违纪事件数 in which a weapon was involved.
* Please note: When a group has fewer than 10 enrolled students, all values for at least the two smallest groups are suppressed.
蒙特莱克利维项目
BEX V
Building Excellence V (BEX V) Capital Levy will fund modernization of the landmarked Montlake小学 School. It will also provide technology equipment and services, 比如电脑, printers, 以及其他教学技术.
利维批准: 2019
阅读更多关于这个项目的信息.
About BEX
The Building Excellence (BEX) Capital Levy funds projects such as those that modernize or replace aging buildings, 资助学生学习的技术, address earthquake and safety issues and major preventive maintenance needs throughout the district.
BTA III
2010年2月, the $270M, 六年基建征费, Buildings, 科技及学术III (btaiii), 获得73人支持.百分之四十五在征款选举中投票. 这是对建筑物的更新, 技术和体育(BTA II)税, 于2004年2月由选民通过.
- 2012: Install new roofing, new exhaust fans and new meters.
BTA II
In 2004, Seattle voters approved the BTA II capital levy. The levy funded nearly 700 facility improvement projects and technology upgrades at every school in the district.
- 2011:升级图书馆,新增书架, 新收银台, 安装在天花板上的视频投影仪, 重新粉刷墙壁和地板.
- 2009办公室和自助餐厅的地板都更换了. Water-damaged flooring in one classroom was also replaced. Composite rubber flooring replaced the water-damaged floor of the gymnasium. Ceiling tiles and lights in halls and cafeteria were replaced. New window shades were installed in portables, cafeteria and gym. New electric heaters replaced the oil stoves in two portable classrooms.
About BTA
The Buildings, Technology and Academics (BTA) Capital Levy supports the district’s long-range plans to upgrade and renovate aging school facilities and address enrollment growth.
The BTA IV Capital Levy was approved by voters in 2016. 正规买足球的App will receive these levy funds from 2017 through 2022.
在蒙特莱克注册